Permitting work done. Build in Richmond on 1.84 acres in Chariho. In hand: RIDEM-approved 3-bedroom septic design (valid to Feb 2028), RIDEM freshwater wetlands permit, boundary survey, wetlands delineation, state-witnessed soil evaluation, and an engineered site plan including the driveway's 3-sided bridge over a seasonal stream (design previously reviewed by RIDOT; buyer to obtain a new driveway permit). Level, mostly wooded, with the homesite set privately at the rear behind stone walls and a short walk to the Wood River. I-95 within a mile. Full permit packet available on request.